Fig.3: The Baxiandong doline-reservoir constructed by damming a swallet hole, showing low water level in dry season. The water is conducted into the aqueduct in Fig.2 through a natural underground course
Comments and suggestions to Webmaster, Copyrights by Karst Dynamics Laboratory and Network Center of Guangxi Normal University, 1995-1999. All rights reserved.